01 / SCOPEEquipment inventory and assessment
Create a practical record of module models, approximate quantities, condition and accessible serial numbers. Ask whether the equipment should be checked for repair, manufacturer return or another suitable route before committing everything to disposal.
02 / SCOPEDecommissioning scope planning
Agree which parts of the system will be removed and which must remain operational. Identify the electrical contractor, site-access arrangements and responsibilities for making the work area safe, with a schedule suited to your building or plant.
03 / SCOPEPanel removal coordination
Discuss roof height, access restrictions, lifting needs and protection of the surrounding property. The proposal should explain who arranges specialist labour and equipment, and how existing roof defects or unexpected conditions will be managed.
04 / SCOPECollection and transport
Share the pickup location, equipment type and condition before booking. Confirm the receiving party and agreed packaging arrangements. Record what leaves the site, who takes custody and whether any materials require a separate collection.
05 / SCOPERecycling and take-back enquiries
Ask whether the facility accepts your specific module technology and condition. Manufacturer take-back and specialist recycling services can have different requirements, so confirm acceptance and the responsible receiving entity before dismantling or dispatch.
06 / SCOPESite closure and documentation
Request a record of equipment removed, destination and completed work. Where the project includes roof reinstatement, disposal documentation or connection changes, name the party responsible and the evidence you will receive before final payment.